|
With the help of Alan Regier, our site engineer, we were able to locate a new home site, 1034 feet up the Mountain from the bridge. This meant building an extensive road, installing power lines 6 times as far as originally intended, and designing a new pressurized mound septic system. Some might feel that this would be a detriment, but to the contrary, this new location gave us an unexpected surprise. A view that takes our breath away. For this, and all your help, we thank you Alan.
|
|